Copper Mine Expansion Project
As part of a $100 Million copper mine expansion project, Nickel Bros Industrial transported (27) electrical buildings (the largest being L: 53’ W:25’ and H: 16’10”) over 500 kilometres directly from the manufacture to the remote mine site.
The largest vessel was hoisted by Nickel Bros Industrial sixty feet up to an elevated platform and installed horizontally 110’ by Nickel Bros Industrial using jack and slide equipment.
Off-road conditions, over-dimensional pieces and an elevation installation all added different levels of complexity to the project.